Before you appoint a contractor
Permits, programme, what moves a price, and what happens after handover — answered as fully as we would answer them on a call, because a vague answer on a website only means the same question gets asked again.
Eagle International General Contracting LLC is an Abu Dhabi general contractor with five divisions under one team: MEP engineering, interior and exterior fit-out, hardscape and landscape, swimming pools, and IT network infrastructure. Most clients appoint us for more than one of those at once, which is the point — the interfaces between trades are where fit-out projects usually lose time, and holding them inside one contract removes the argument about whose scope a problem belongs to.
Eagle is based in Abu Dhabi and has delivered projects in Abu Dhabi, Dubai, Al Ain and Ajman. The delivered record includes office fit-out and ICT infrastructure in Abu Dhabi, a design-and-build law office in Dubai Business Park, the renovation of 24 apartments in Al Ain, and the Department of Ports & Customs customer service centre in Ajman.
Since 2015. In that time the company has delivered work for government departments, international engineering contractors, legal practices, resorts, real-estate owners and private villa clients across the UAE.
Yes. Concept design, working drawings and value engineering are done in-house, and most of our projects are appointed as design-and-build. The practical benefit is speed of decision: when a detail turns out to be unbuildable or over budget, the person who drew it and the person who has to build it are in the same company, so the alternative is agreed in days rather than through a chain of correspondence.
There is no useful single rate, because the same floor area can differ by a factor of three depending on scope. The variables that move the number most are: whether the space is a bare shell or an existing fit-out being stripped, how much of the MEP is being replaced rather than reused, the ceiling and lighting specification, the amount of bespoke joinery, the acoustic performance required between rooms, and whether the building is occupied — occupied buildings mean night and weekend working, which is priced differently. Eagle prices against a measured scope rather than a rate per square metre, and will tell you which of those variables is driving your figure.
For a straightforward commercial floorplate, construction is usually measured in weeks rather than months once permits are in hand. The part clients under-estimate is what comes before: design development, landlord or building-management approval, and municipal and civil defence approvals. Building that approval path into the programme at tender stage, instead of discovering it after mobilisation, is normally the difference between a project that finishes on its date and one that does not.
Interior fit-out in Abu Dhabi is approved by the Department of Municipalities and Transport (DMT), which checks the design against zoning, building code and safety requirements, and separately by Abu Dhabi Civil Defence for fire-safety systems. Where the works fall under Estidama, the Pearl Rating System applies through the permit. On top of the government track, most towers and developments run their own landlord or building-management approval with an appointed consultant, its own insurance thresholds and its own permitted working hours. Eagle handles the submissions and the coordination between those tracks.
Yes. A private pool in Abu Dhabi needs approval before excavation, and if the villa sits inside a managed community the developer's approval is required as well as the municipal one. DMT has a streamlined permit route for minor works on residential properties which covers swimming pool construction, and a licensed contractor can secure it directly. Safety requirements — barriers, depth marking, and the pool's own drainage and filtration provisions — are part of the approval, not an optional extra afterwards.
The plant room. The filtration equipment, pumps, balance tank and their power and drainage need a location, an access route for maintenance, and a noise position that does not sit under a bedroom window — and all of that is far cheaper to decide before the shell is poured than after the landscape is finished. Waterproofing detail, tile finish, lighting circuits and the interface with the surrounding hardscape should be resolved at the same time, because each of them crosses into another trade.
Because ductwork, cable containment, sprinkler pipework, drainage falls and lighting all want the same 400 millimetres above the ceiling, and drainage is the one of them that cannot be moved. When those services are coordinated on drawings before installation, the ceiling height in the finished room is the one that was designed. When they are not, the clash is discovered on site, something gets dropped, and the room ends up lower than the client approved. Eagle resolves that layout before finishes are ordered.
Yes, and a good part of our record is exactly that: an office expansion built beside colleagues still working, apartment renovation with services kept live to occupied floors, resort grounds renovated while guests were in residence. Occupied-site work is a sequencing and permits problem more than a construction one — noise windows, lift and loading bookings, dust and fire-alarm isolation, and a programme that returns usable space in stages rather than all at the end.
Yes, on annual maintenance contracts. Landscape, irrigation, swimming pool plant and network infrastructure are the scopes most often kept under maintenance, because all four degrade quietly: planting fails in a Gulf summer without correct irrigation, pool water chemistry drifts, and a network that was documented at handover stops being documented the first time someone re-patches it without a record.
The failure mode in the Gulf is rarely a single hot day; it is the cycle. Sustained UV, surface temperatures well above air temperature, salt-laden coastal air and airborne dust are what actually age a specification. That points to powder-coated or marine-grade aluminium over untreated steel, UV-stable composite decking or dense hardwoods over softwoods, mineral and stone finishes over organic ones in full sun, planting selected for salinity and low water demand, and fixings chosen for the corrosion class of the site rather than for the catalogue price.
The copper and fibre backbone of a building and everything that has to be true about it: containment routes, patch panels and racks, network and data rooms planned with power, cooling and containment, the active components that run on the infrastructure, and the testing and labelling that make it maintainable. In practice it also carries the building systems that share the same routes — CCTV, access control, PABX and fire alarm — which is why it belongs in the construction programme rather than being retrofitted around finished ceilings.
Send the scope through the contact form on eieagle.com or email contact@eieagle.com. Drawings, a floor area, the emirate and your target dates are enough to start; if you do not have drawings, a site visit gets us the same information. You will be answered by someone who can talk about the technical scope rather than by a form response.